![]()
Subject:
Change to Heathrow Dependent Parallel Approach (TEAM) Operations
A
review of Heathrow Parallel runway operations has taken place. To conform with ICAO requirements, procedures for Dependent Parallel
Approach (TEAM) operations at Heathrow will be revised effective 1 June 08. The
revised procedures involve adoption of a 2nm diagonal separation standard for
dependent parallel approaches and introduction of criteria for visual
separation on parallel approaches.
Successive
aircraft established on adjacent parallel runways can be separated by 2.0nm
diagonally subject to the following criteria:
Radar
Separation for successive aircraft during Dependant Parallel approaches to
different runways may be reduced below 2nm once the following criteria are met:
Note
1: Should the pilot report unable to maintain separation appropriate remedial
action shall take place immediately to achieve standard separation.
Note
2: The use of dependent parallel approaches is specified only for aircraft that
are radar vectored onto final approach and then establish on an ILS LLZ or MLS
FAT and at this time is not authorised for aircraft flying the RNAV(GNSS) final approach procedures.
Regards
Richard
Head of External Safety Relations
Division of Safety